Estimate, not a quote.
Everything is worked out in your browser. Your answers are not sent or saved.
The fence
All the runs are treated as one connected fence. For separate fences, work each one on its own.
Spacing, rails and pickets
Post holes and concrete
Check the post or concrete maker's instructions for the hole size. This page does not say what is deep enough.
The prices behind the estimate
Every number has a source and a date. Type your own price on any row to replace it. The estimate, the print sheet and the bid check all follow.
| Item | Low | Typical | High | Source | Your price |
|---|---|---|---|---|---|
| Post, price eacheach | – | – | – | Typed by useras of October 14, 2026Type your price | |
| Rail, price eacheach | – | – | – | Typed by useras of October 14, 2026Type your price | |
| Picket, price eacheach | – | – | – | Typed by useras of October 14, 2026Type your price | |
| Concrete mix, price per bagper bag | – | – | – | Typed by useras of October 14, 2026Type your price |
Compare bids
Enter two to four bids and the linear feet of fence each one covers. Tick what each bid says it includes. A low price per linear foot can leave things out.
Enter two bids to compare them.
Need a website to go with it? See Digital Works Forge website packages. A small San Antonio studio that builds sites for local businesses.
How to estimate a wood fence in five steps
- Add your runs. Enter the length of each straight run in feet. Add the number of gates and the width of each one: a gate's width comes out of its run. Say whether the fence is open or a closed loop.
- Set spacing, rails and pickets. Choose the post spacing (8 feet to start), the rails per section (2 or 3), the picket width and the gap between pickets. Sections, posts, rails and pickets show at once, with the waste percentage added to rails and pickets.
- Size the post holes. Enter the hole diameter and depth in inches, the post width and the bag size. You get the concrete for one post, the total in cubic feet and the number of bags, rounded up.
- Type your prices. We never show a price we did not source, so the price boxes start empty. Type what your supplier told you and a cost range appears. Bids can be compared per linear foot.
- Print the sheet. Download a one-page sheet in English, Spanish or both to bring to your supplier or contractor.
What this calculator does, and what it does not
It turns the length of your fence into a shopping list: sections, posts, rails, pickets, and the concrete for the post holes. The counts are arithmetic on the numbers you type, so they come out the same every time you enter the same numbers.
It is an estimate, not a plan. It cannot see your soil, your slope or your gate hardware, and it does not say what your yard needs. Check your supplier's sizes before you buy, because a post, a rail or a picket may not be cut the way the page assumes.
Sections and posts
A section is the stretch of fence between two posts. The calculator divides the run by the post spacing and rounds up, because a last short section still needs its own post. An open run needs one more post than it has sections, since both ends need a post. A closed loop comes back to where it started, so it needs as many posts as sections.
Each gate adds a post in this estimate, and the gate's width is taken out of its run before the sections are counted. If you enter a 60 foot run with one 4 foot gate, the fence itself is 56 feet.
Worked example: a 100 foot run
Take one straight run of 100 feet, posts 8 feet apart, 3 rails per section, 5.5 inch pickets with no gap, 10 percent waste, a hole 12 inches across and 32 inches deep, a 3.5 inch post and 50 pound bags.
Sections: 100 divided by 8 is 12.5, which rounds up to 13. Posts: 13 plus 1 is 14. Rails: 13 sections times 3 is 39, and 10 percent waste makes it 43. Pickets: 1,200 inches divided by 5.5 is about 218.2, which rounds up to 219, and with waste it is 241. Concrete: 26.1456 cubic feet in all, which is 70 bags.
Pickets across a run
The run's length in inches is divided by the picket width plus the gap, and the answer is rounded up. Pickets set edge to edge use only the width. Pickets with a gap between them cover more distance each, so you need fewer of them.
A second example: a 50 foot run with 5.5 inch pickets and a 0.5 inch gap. Each picket takes 6 inches, so 600 inches needs 100 pickets, and with 10 percent waste you buy 110. Check your supplier's sizes, because a board sold as 6 inches wide is often narrower once it is cut.
Rails and waste
Rails are the horizontal pieces the pickets are fastened to. The calculator multiplies the sections by the rails per section, then adds the waste percentage and rounds up. Two rails per section is common for a short fence, and three adds a rail in the middle. This page does not say which one your fence needs.
Waste covers cut ends, boards that arrive bent or split, and mistakes. The default is 10 percent, and it applies to rails and pickets only: posts and concrete are not padded. You can change it. A fence with many angles or a lot of cutting may call for more.
Gates, corners and closed loops
Corners and gates are where this estimate is least certain. A corner may need extra posts or a different layout than a straight run. A gate usually needs sturdier posts, a latch and hinges, and the opening is not always the same as the gate. Each run you enter is rounded up on its own, so a fence with many runs can come out with a few more sections than one long run of the same total length.
Treat the post count as a starting point for a conversation. Show the sheet to a contractor or your supplier and ask how they would set the corners and the gate posts.
Concrete for post holes
The calculator treats each hole as a cylinder and subtracts the space the post takes up. In the 100 foot example, a 12 inch hole 32 inches deep with a 3.5 inch post leaves about 1.8675 cubic feet of concrete around each post. Times 14 posts, that is 26.1456 cubic feet. A 50 pound bag is taken as about 0.375 cubic feet, so 26.1456 divided by 0.375 is about 69.7, and the bags are rounded up to 70.
In the 50 foot example, 8 posts in 10 by 24 inch holes need 7.3655 cubic feet, which is 20 bags. The concrete figure ignores any gravel base, so it errs high. Bag yields differ, so check the label on the bag you plan to buy. You can pick 40, 50, 60 or 80 pound bags.
Where the hole size comes from
The starting hole size is a rule of thumb from a maker's instructions: a hole about three times the width of the post, and about a third of the post's length underground. It is a place to start, not an answer. This page does not say how deep your holes go, and it makes no claim about wind, frost or soil. Ask your supplier or a local contractor, and type the hole size they give you.
Before you build or dig
Rules about where a fence may go, how tall it may be, what it is allowed to look like and whether it needs a permit differ from place to place, and this page does not cover them. Check with your city or county, and look at the neighbors' records and your own survey papers if you have them. If you live in an association, ask them too.
Call 811 before you dig. It is the national number for having buried lines marked. Do it before the first post hole, not after.
- Ask the city whether a permit is needed.
- Ask for your lot's survey or plat records.
- Call 811 before any digging.
- Ask your supplier to confirm board and bag sizes.
- Ask a contractor how they would handle corners and gates.
Your answers and your privacy
The calculator runs in your browser. It has no place to type a phone number, an email or an address, nothing you enter is sent to a server, and nothing is saved when you close the page. Print the sheet if you want to keep the numbers.
Frequently asked questions
Is this a quote?
No. It is an estimate of quantities, and a cost range only when you type prices. A quote comes from a supplier or contractor who has seen the site.
Why are the price boxes empty?
We only show numbers we can source, and we have no sourced fence prices. Type the prices your supplier gave you and the cost range fills in, marked as typed by you.
How many posts do I need?
Divide each run by the post spacing and round up to get the sections. An open run has one more post than sections, a closed loop has the same number, and each gate adds one in this estimate. Corners and gates may change the real count, so ask a contractor.
Why does the gate width come off the run?
The gate fills part of the line, so there is less fence to build there. A 60 foot run with a 4 foot gate has 56 feet of fence.
Why is there waste only on rails and pickets?
Those are the pieces that get cut and sometimes arrive damaged. Posts and concrete are counted as they are. The 10 percent default can be changed.
How deep should the hole be?
This page cannot tell you. The default is a maker's rule of thumb: about three times the post width across and about a third of the post's length underground. Ask your supplier or a local contractor what your yard calls for.
Why does the concrete come out high?
The figure ignores a gravel base and rounds the bags up. If you put gravel in the hole, you need less concrete. Check the yield printed on the bag you buy.
Do I have to give a phone number or email?
No. There is no place to enter one, and nothing you type is sent anywhere.